The Pipes Go In Before the Homes. So Does the File.

Nobody holds a ribbon-cutting for a watermain. When a First Nation builds new homes, the photographs are of families moving in. But before any of that can happen, someone has to extend the water and wastewater lines, clear and grade the site, build the road and bring in power. That servicing work is usually funded separately from the homes, built by different contractors, often designed to connect to a neighbouring municipality's system, and finished months or years before the first foundation is poured. It is also the part of the project whose records are most likely to go missing, because by the time the houses are celebrated, the people who built the pipes have moved on.
Recent context
In January 2026, Indigenous Services Canada announced a $6 million federal investment for infrastructure improvements on Semiahmoo First Nation lands near Surrey, B.C. According to the Indigenous Services Canada news release, the funding supports extending the Nation's water and wastewater systems to service a planned 32-unit BC Housing development, connecting the site to the City of Surrey's municipal systems, along with site clearing and levelling, roads and other utility services. The release notes that the department had also recently provided more than $400,000 for design upgrades to the Nation's water and wastewater systems, and that the housing development is planned pending necessary approvals.
That one announcement involves a First Nation, two orders of government, a provincial housing agency and a city. Each will hold part of the record. The Nation is the one that has to live with the result.
Why servicing records matter more than they look
Servicing is the foundation the community will build on for decades. The records behind it answer questions that come up long after the funding agreement is closed.
- Capacity. How many more homes can the new lines and lift stations carry? The design basis and the commissioning results say so. Without them, the next housing phase starts with a study that repeats work already paid for.
- Location. Where exactly are the pipes, valves and service connections? As-built drawings and survey data are what keep a future excavation from hitting a main.
- Responsibility. Where does the Nation's system end and the city's begin? The servicing agreement, the connection permits and the inspection records set the line between who maintains what and who pays when something fails.
- Funding conditions. Federal and provincial agreements usually require reporting on what was built and how the money was spent. Auditors and funders ask for invoices, progress claims and completion certificates, sometimes years later.
- Operations. Operators need the manuals, warranties, spare parts lists and maintenance schedules for every pump and control panel, in a place they can find when an alarm goes off at night.
Where it tends to come apart
The pattern is familiar. The engineering firm keeps the design files. The contractor keeps the daily logs and the test results. The city keeps its copy of the connection permit. The funder keeps the reports it received. The housing agency keeps the housing file, which starts where the servicing file ends. The Nation's own staff may change during the project, and the band office ends up with a closeout binder that shows the work was finished but not exactly what was built, where, or on what terms. When the next phase of housing comes, or a line breaks, the Nation has to ask other people for its own history.
A routine for Nations running servicing work ahead of housing
- Open one project file at the start, owned by the Nation. Put the funding agreement, the scope, the design contract and the servicing or connection agreement with the municipality in it before construction begins.
- Write delivery of records into every contract. Require the engineer and the contractor to submit drawings, test results, inspection reports and progress claims into the Nation's file as the work proceeds, not only at the end.
- Track every change against the drawing it changes. A rerouted line, a substituted pump or a field decision about depth should be recorded with who approved it and why.
- Keep the funder reporting in the same place. Each report sent to a funder, and the documents behind it, should sit beside the work it describes so the numbers can be traced.
- Insist on as-builts and commissioning before final payment. Hold back the last payment until surveyed as-built drawings, commissioning results and operations manuals are in the file and checked.
- Hand the file to the next phase. When the housing project starts, give its team the servicing record, so capacity, locations and connection terms are known from day one.
This is general information, not legal or engineering advice; the funding agreements, the servicing agreement and the engineer of record set the actual requirements for any project.
The homes depend on what is under them
The houses are what a community sees. The servicing is what lets them stand, and what will let the next homes follow. A Nation that keeps the whole record of that work in one auditable system, under its own control, does not have to rebuild its history every time it plans its future. It can open the file, see what was built and on what terms, and get on with the next phase.