The Loan Closes Once. The Affordability Promise Runs for Decades.

For a rental developer, closing the financing feels like the finish line of the hardest part. The underwriting is done, the agreements are signed and the money can flow. But public financing and public land now come with obligations that outlast construction by decades: a set number of affordable units, rent limits, reporting to the lender or the program, and conditions that pass to whoever owns or manages the building later. The day the loan closes is the day the long record starts.
Recent context
In August 2026, the federal government and the City of Toronto announced a partnership to unlock 18 housing projects expected to deliver more than 5,600 rental homes. According to the Housing, Infrastructure and Communities Canada backgrounder, the package includes more than $310 million through Build Canada Homes for nine projects on City-owned land, more than $1.8 billion in low-cost financing through CMHC's Apartment Construction Loan Program for nine purpose-built rental projects, and up to $600 million in additional financing capacity for future Toronto projects that meet program requirements. The backgrounder says construction is expected to begin on more than 4,500 homes before the end of 2026, and that the Build Canada Homes investments are subject to due diligence, program requirements and definitive agreements, while the loan financing is subject to underwriting and credit approval. For one listed project, it notes a 40-year affordability requirement under its housing agreement.
Forty years is longer than most development companies have existed. It is longer than the career of anyone who will sign the agreement.
What the long obligations require you to prove
A funder or lender rarely asks whether you kept your promises in general. It asks for evidence of specific things, often years after the fact.
- What was approved. The term sheet, the definitive agreement, the approved unit mix and the conditions precedent, in the versions actually signed.
- What was built. The permit set, the change orders that altered unit counts or sizes, and the as-built drawings that show the affordable units are the ones the agreement describes.
- When it was built. Start dates, draw requests and completion certificates matter when a program ties funding to construction milestones.
- How it was spent. Cost reports, invoices and the reconciliation behind each loan advance or contribution.
- How it is being operated. Rent rolls, tenant eligibility records and annual compliance reports for as long as the affordability period runs.
Where developers lose the thread
The development team builds the file and the operations team inherits the obligation, and the two rarely share a system. The financing documents sit with the development lead and outside counsel. The construction record sits with the general contractor and the architect. Change orders that moved a unit from one floor to another are approved by email. The property manager receives a binder of warranties and keys, but not the agreement that says which units must be rented at what level and for how long. Ten years later the building is refinanced or sold, a new manager takes over, and the first compliance question exposes the gap. Nobody can show that the affordable units on the rent roll match the ones in the agreement.
A routine from term sheet to year forty
- File the signed agreements as the spine of the project. Store the executed term sheet, definitive agreement, housing agreement and loan agreement in the project file, and extract every obligation with its trigger date and its owner.
- Map the affordable units to the drawings. Identify each committed unit by number and plan, and keep that mapping current through every design change.
- Route change orders through the obligations. Before approving a change that affects unit count, size or mix, check it against the agreements and record the funder's consent where it is needed.
- Keep draw packages complete. Each advance should be filed with its cost report, invoices, inspection or progress certificate and the lender's approval.
- Close out to operations with the obligations attached. Hand the property manager the unit map, the rent limits, the reporting calendar and the agreement, not just the operations manuals.
- Make the file survive a transaction. On refinancing or sale, transfer the complete record with the asset, so the next owner inherits the evidence along with the covenant.
This is general information, not legal or financial advice; the executed agreements and program requirements govern any specific project.
The building keeps the promise only if the file does
Public money and public land are speeding up rental construction, and they come with long memories. A developer or owner-operator that keeps the whole project, from term sheet to rent roll, in one auditable system can answer the funder in year five or year thirty-five the same way: by opening the file. One that does not will spend those years reconstructing what it agreed to, and hoping the building still matches.